West Gate Tunnel

A truck Carrying a Large Steel Pipe

A transformational project for the city of Melbourne, construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road; a 2.8km eastbound tunnel and 4km westbound tunnel under Yarraville; a new bridge over the Maribyrnong River; an elevated road along Footscray Road to the Port […]

Jump Start Columns

High rise building construction – jump start columns ABFI manufactured the columns, inserted the reo bar, fabricated the column connections, arranged coating, and supplied each column to the site on a JIT basis.

Fabrication – correction of OEM faults

In this instance ABFI were contracted to cut to length and flange sections of a WIFI tower, where the original offshore manufactured sections were outside specification.